This RG1 conversion project took around 12 months to complete, the build included:    - In total we created 6 flats incl...
21/04/2021

This RG1 conversion project took around 12 months to complete, the build included:
- In total we created 6 flats including 1 x penthouse, 1 x 2 beds, 2 x 1 beds, 2 x Studios
- All flats completed to a high level and shown in pictures
- Flats furnished by a local designer

End result - total property value increased by over 50%

If you are interested in speaking with us regarding a new development please get in touch!

Thanks,

The Build-pro team

Inside before and after during the build phase
15/08/2018

Inside before and after during the build phase

The project took around 6 months to complete the build included:    - In total 13 flats including 1 penthouse in roof sp...
14/08/2018

The project took around 6 months to complete the build included:

- In total 13 flats including 1 penthouse in roof space (7 x 2 beds & 6 x 1 beds)
- All flats completed to a high level and shown in pictures
- Flats furnished by a local designer
- Renovation on the lift in the building

End result - total property value increased by over 40%

If you interested in any of the products in the pictures or building work please send us a message.

Thanks,

The Build-pro team!

Project took around 10 weeks the project included:- Conversion of carport into a lounge- New Kitchen- New Electrics- New...
13/08/2018

Project took around 10 weeks the project included:

- Conversion of carport into a lounge
- New Kitchen
- New Electrics
- New Heating system
- Addition of two new bathrooms and downstairs WC
- New Windows
- Full cosmetic works throughout
- New pitched roof and 4ft Skylight Kitchen

End result - rental increased from £1100 to £1500 pcm fully modernised property once completed valued with an additional £50k equity.

If you interested in any of the products in the pictures or building work please send us a private message.
Thanks,

The
Build-pro team!

RG1 - Café RenovationThis project just recently completed was designed by the Café owner and work completed by contracto...
09/08/2018

RG1 - Café Renovation

This project just recently completed was designed by the Café owner and work completed by contractors.

The project took around 4 weeks once we began building, the project included:

- New Shopfront
- New Electrics
- New Walls, flooring and ceilings including decorating.
- New Cafe Counter
- Kitchen Upgrade
- New Awning/Barriers

If you interested in any of the products in the pictures or building work please send us a private message.

Thanks,

The
Build-pro team!

Address

Basingstoke

Alerts

Be the first to know and let us send you an email when Build-Pro Developments posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share