Bulldogs Digital

Bulldogs Digital Helping construction companies get seen online and land better projects.

- Photography & Videography
- Social Media
- Web Design
- SEO

We're a construction & trades marketing agency covering a wide range of services including web design, search engine optimisation, social media management, advertising, photography, drone content, videography & more.

We visited  site at Nevil House, where external maintenance works are continuing on the west elevation. Roof repairs and...
23/02/2026

We visited site at Nevil House, where external maintenance works are continuing on the west elevation. Roof repairs and replacements are now complete, marking a key milestone in the programme. With the rear scaffold down, we’ll be back to capture drone footage and show the completed works from a different perspective. 🛠️

We captured the finished roofing works by  on this luxury new build in  . The project features a natural slate roof pair...
20/02/2026

We captured the finished roofing works by on this luxury new build in . The project features a natural slate roof paired with sleek single-ply systems across the flat areas, delivering a high-spec finish that blends traditional materials with modern detailing. A standout result that suits the quality of the build perfectly. 🛠️

19/02/2026

We captured the finished result at project, now fully complete. The gravel driveway, rear patio, and brickwork are finished, with a bespoke oak pergola in place to create a shaded seating area. Final turfing, planting, and garden lighting tie the whole space together, rounding off a well-delivered scheme. 🏡

We stopped by to see progress on ’s double-storey extension, where the roofing is coming together quickly. Both flat roo...
18/02/2026

We stopped by to see progress on ’s double-storey extension, where the roofing is coming together quickly. Both flat roofs are now installed and the main tiling is well underway. Once the main roof is finished, the team will move onto the rear vertical tiling ahead of dropping the scaffold. The exterior isn’t far off completion now. 👷♂️

We visited site to mark completion of Cottier Contracting’s enabling works package at Maryon Road. The scope included si...
16/02/2026

We visited site to mark completion of Cottier Contracting’s enabling works package at Maryon Road. The scope included site clearance, bulk earthworks, temporary works, piling mats, and utility diversions, all delivered safely, on programme, and ready for the next phase of the project to move forward. ✅

We checked back in across site at ’s 6-plot development in  , where roofing works are progressing well. Plots 1 and 2 ar...
12/02/2026

We checked back in across site at ’s 6-plot development in , where roofing works are progressing well. Plots 1 and 2 are nearly complete with just the hips and ridges left to finish, while plots 3–6 have been felted and battened and tiling is now underway across the rest of the site. 🚧

We caught up on site to see  progressing with the stonework, now complete using lime mortar. The team have moved on to l...
11/02/2026

We caught up on site to see progressing with the stonework, now complete using lime mortar. The team have moved on to laying the limestone paving and setts across the site, with preparations for the resin driveway up next at the front. Steady progress as this scheme continues to take shape. 🧱

We compared the before and after photos we took from ’s   project, and the transformation speaks for itself. This full r...
10/02/2026

We compared the before and after photos we took from ’s project, and the transformation speaks for itself. This full refurbishment, paired with a new extension, completely reworked the layout to create a more open and functional home. The finished design includes a cinema room, open-plan kitchen and living space, and four updated bathrooms, giving the property a completely new feel throughout. 🏚️➡️🏠

Not too long ago, we captured progress on site at Brunswick Place, where  have completed the rear flat roof and leadwork...
09/02/2026

Not too long ago, we captured progress on site at Brunswick Place, where have completed the rear flat roof and leadwork, alongside tile and hip replacements to the main pitched roof. Repairs to the Juliet balcony are nearly finished, and at ground level the front door has been stripped and primed, ready for full redecoration. Strong progress across the project. 📸

We were on site at the former Debenhams building in  , where  are making a strong start on the main roof. The vapour con...
06/02/2026

We were on site at the former Debenhams building in , where are making a strong start on the main roof. The vapour control layer is almost fully installed, a key stage in the warm roof system that protects the structure from moisture and long-term performance issues.

With this first phase nearly complete, the team will soon move on to installing the insulation ahead of the SIKA single-ply membrane. 🏢

We stepped onto site to see progress on ’s double-storey extension, where the rear timber frame is now up and the struct...
05/02/2026

We stepped onto site to see progress on ’s double-storey extension, where the rear timber frame is now up and the structure is really taking shape. Roofing works have started and the project won’t be far off being watertight.

Groundworks are also moving ahead in the garden, with the rear patio area and retaining wall footings now dug out. Good momentum across both the build and external works. 🚧

Address

3 Church Street
Littlehampton
BN175EL

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Alerts

Be the first to know and let us send you an email when Bulldogs Digital posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Bulldogs Digital:

Share