30/06/2026
Installation of the Guinness project.
After weeks of fabricating and painting of this Guinness project the most challenging element was the installation.
Installed over 5 visits to site (I think, I've tried to forget about this bit) between the three of us we fitted all the elements of this job. This is arguably the most boring bit of a job but the most important, no one wants a 10ft ostrich falling on th whilst splitting the G.
Custom made wall plates fitted with threaded bar and chem fix then bolted into the side profile of each element. Lots of maths to work out load bearing, lots of drilling, lots of ups and downs the scissor lift, lots of singing.
Hell of a job.