30/08/2026
☀️ **SUMMER 2026 — WHAT A SUMMER.**
While the schools were quiet, the Cubed team was anything but.
🏫 **128 walls transformed**
🎨 **1,024+ hours of design**
🖨️ **37.2 rolls of graphics produced**
📏 Around **1,860 linear metres of print**
🚐 On some days, **5 schools being installed at the same time**
📍 Teams working across **Birmingham, Southampton, Kent, London and beyond**
And every one of those 128 walls was **custom designed for that individual school**.
No picking from templates.
No off-the-shelf designs.
No making one idea fit every school.
Every project starts with the school, the space and what they want pupils, staff and visitors to feel when they walk through it.
That could be curriculum support, school values, local history, reading, wellbeing or simply creating a stronger first impression.
Our design team builds each wall from scratch, then our production and installation teams bring it to life.
A massive thank you to every school that trusted **Cubed Creative** with their spaces this summer — and to everyone behind the scenes who made it happen.
**128 walls. 128 individual designs. One very busy summer. 🧡**