31/01/2026
During a renovation ikeja Lagos state at Center for Management and Development (CMD) the old plumbing system was successfully replaced with a modern PPR pipe system using Sanica pipes and fittings. The old pipes were removed, new pipes were installed using heat fusion welding, and the system was pressure-tested to ensure leak-free and efficient water circulation, restoring reliable water supply to the facility.