PROJECT COMPLETION & SUCCESSFUL TURNOVER REPORT
Project: Blast Freezer System Upgrade & Cold Room Rehabilitation
Date: July 1, 2026
Prepared By: Manicad Refrigeration and Airconditioning Services
β
FULLY COMPLETED WORKS
1. Condensing Units: Supply & installation of 2 sets Γ 30HP blast freezer condensing units
2. Freezing Capacity: Rated for 2 tons of product load per batch
3. Evaporator: Complete rehabilitation of 2-circuit evaporator assembly
4. Cold Room: Full structural repairs and thermal sealing
5. Access: Installation of new custom-built swing door
6. Flooring: New PU (polyurethane) insulated flooring
π PERFORMANCE TEST RESULTS
- Target Temperature: -40Β°C to -45Β°C
- Achieved Stable Temperature: -45Β°C (consistently maintained under full 2-ton load)
- System Status: All pressures, amperage, safety controls and cycles running within manufacturer standards
π OFFICIAL TURNOVER
All works are fully inspected, tested, commissioned, and officially turned over for full commercial use.