Time to Build
Went to a great customer of ours and built there new building pad, 70x90ft x 6ft elevation change
We cut and balanced what the site allowed and moved the remaining dirt by dump truck from a source onsite total of 1,420 cubic yard compacted.
Stripped the topsoil from the building site, built pad in compacted lifts, graded in construction driveway, installed swell for drainage.
Graded down and removed an excessively high shoulder of 4ft tall at the road to allow them to mow and properly maintain their property better.
And lastly Installed a 400ft x 12ft asphalt millings driveway we placed and compacted with a loader and roller 7 x 20ton loads of asphalt millings to ensure a solid entrance.
Great project to be a part of, If we can help you with your project give us a
call or text at 864-414–6690