Some of our good friends at Dark Horse Horsemanship contacted us about a project of theirs a new covered arena measuring 200x100ft.
We went in and stripped away topsoil and debris from the excavation site being the structural fill dirt was going to be extracted onsite and then stripped the arena site of organics and topsoil down to structural dirt.
We cut and balanced approximately 700 yards on the arena site with what material that could be graded out to maintain the set entrance height for the front and then we moved in an additional 2520 cubic yards on to site from our extraction point further away on the farm.
Pad was placed on grade
Swells installed were needed for proper drainage
Extracted topsoil was placed back over extraction site and slopes to help with grass growth and stabilization of the area.
We will be back in the following weeks after the building is completed to put sand down for the horses footing.
Turned out Great if we can help
You with your next project give us a call or text at 864-414-6690
And if your interested in learning to ride horses send Dark Horse Horsemanship
a message
Thanks to all our awesome Customers