04/02/2026
Okay, current situation. We are working, I had started to make a price sheet/flyer last fall. Everything is so in flux and erratic right now its unreal. The cost of sign making materials goes up weekly. I normally roll the price of traveling into an installation job. With the current fuel prices, and fluctuations there of, I cant do it. Everything has to be done on a job, by job basis until further notice.